House construction in Islamabad
Building on a plot in Islamabad or Rawalpindi? Send the location and your drawings to our G-11 office. We can price the shell, or take the build through finishes and handover.
Planning the finishes before the shell is closed

Grey structure or turnkey?
Grey structure
The quotation sets out excavation, foundations, the structural frame, masonry, roof slabs and agreed rough plumbing and electrical routes. Ask which items are measured separately, especially boundary walls, underground tanks and changes in site level.
Turnkey construction
The scope adds the finishes that make the house usable. Compare floor and wall finishes, windows, doors, kitchens, wardrobes, paint, switches and sanitary fittings. A specification or allowance beside each item lets you see what a different tile or fitting would do to the estimate.
How the build runs
- Plot and drawings. Send the plot dimensions, sector or society, floor plans and any approved drawings. Tell us about site access, a basement or sloping ground.
- Written estimate. We review the drawings and prepare a bill of quantities. Agree materials, exclusions, inspection points and payment stages in writing.
- Structure and services. Review steel and service openings before a pour. Check pipe and conduit routes before plaster conceals them. Record any drawing revision against the quoted scope.
- Finishes and handover. For turnkey work, confirm samples before ordering. Walk the rooms against the agreed specification, record snags and check the corrections at handover.
Comparing construction quotations
Give each contractor the same drawings. Ask who supplies materials, supervises the site and records changes. Compare quantities, material grades and exclusions alongside the total. If the design or soil information is incomplete, ask which figures are provisional.
Questions before you start
Can you quote from drawings prepared by another architect?
Yes. Send the drawing set and its revision date. We review buildability and identify details needed for a written estimate.
How much will construction cost and how long will it take?
Covered area, site conditions, number of floors and finish selections affect cost and timing. We prepare the estimate and agree the construction stages once the drawings and scope are clear.
Can I appoint my own finishing contractor?
Yes. Choose a grey structure agreement and define where our work ends, including rough services, tests and the items handed over to your finishing team.
What if I already have a builder?
Ask about a separate site supervision scope. Bring the drawings, current site stage and the inspections you want covered.
Visit our Islamabad office
ARCH 360 Islamabad
Office No. 01, Silver City, G-11 Markaz, IslamabadMon–Sat 09:00–18:00 PKT